A landfill gas train for engines with an enclosed standby flare, and the monitoring needed to claim carbon credits under CDM rules.
Organics Articles
Organics Group has spent more than thirty years turning ammonia-laden wastewater, landfill gas, organic and food waste, palm oil mill effluent into revenue with biogas flaring technology deployed on over 300 projects worldwide, commissioned across Europe, Asia, the USA and Oceania. This collection brings that work out of the project archive written for the engineers, regulators and operators who decide which technologies is going to solve their problems.
Dissolved Methane in Leachate: How a Methane Stripper Works
Dissolved methane in leachate can be stripped by aeration. See how a 10 l/s plant handles foam, odour, bunding and a guaranteed exit level.
Refuse-Derived Fuel Front-End Preparation: A 1,200 Tonne-per-Day Line-by-Line Guide
Each machine in a four-line front end that turns mined municipal waste at 57% moisture into shredded, dried refuse-derived fuel, with the reasons behind the sizes.
Covered Lagoon, UASB or CSTR for Palm Oil Mill Effluent?
Covered lagoon vs UASB vs CSTR for palm oil mill effluent: footprint, stability, skills and gas storage compared for a 60 t/h mill.
Elevated Landfill Gas Flare Specification: A 600 scfm Worked Example
Elevated landfill gas flare specification worked example: blower, flame range, materials, controls and wind loading for a 600 scfm package.
Landfill Gas Flare Service Agreement: What to Include
Landfill gas flare service agreement: scope, equipment covered, fault classes and response times, plus gaps to close before you sign.
Is a Small Palm Oil Mill Big Enough for a Biogas Plant? A 370 m³/day Example
Small palm oil mill biogas plant: what 370 m³/day of effluent can yield, which inputs are assumptions and what to confirm on site.
Replacing a Hot Exhaust Gas Fan on a Stripping Plant
How to specify a replacement exhaust gas fan for a leachate ammonia stripping plant, from drive and heat protection to casing material.
Replacing Obsolete Instrumentation and Controls
How to replace discontinued probes, drives, displays and transmitters on an ageing leachate plant, and why common spares matter.
Municipal Waste Pyrolysis: Why a FEED Study Comes First
A small municipal waste pyrolysis proposal that fixed the core plant and left the feed end to a FEED study.
Cassava Wastewater Biogas: Covered Lagoon or UASB?
Cassava wastewater biogas: compare covered lagoon, CSTR and UASB digesters for a 300 t/day starch mill, with design figures and filter-cake handling.
Recovering Ammonia from Digestate as Aqueous Ammonia: A Design Walk-Through
Ammonia recovery from digestate by thermal stripping: a design walk-through, scaling limits and a 30-day performance test.
Packaged Landfill Gas Flare with Blower: How the Skid Works
Landfill gas flare with blower: how a 3,000 Nm³/h skid moves, protects and burns gas at 1,000°C, and what is excluded.
Landfill Gas Blower and Flare: Do You Need a Chiller and Filter?
Landfill gas blower and flare: when a chiller and filter are needed for engines, a 1 MW example, 10:1 turndown and the staged route from study to plant.
Landfill Gas Flare Hire or Buy? Weighing Up a 1,000 m³/h Unit
Landfill gas flare hire or purchase? See why hire fees are not credited to a later sale, and how lease purchase can solve it.
Landfill Gas Chilling and Conditioning for Engines: Why Condensate and Ammonia Matter
How a 500 m³/h landfill gas delivery unit cools gas from 35°C to 15°C and reheats it so condensate never reaches the engine inlet.
Ammonia Recovery from Digestate: Sizing a Stripper for Chicken Manure Biogas
Ammonia recovery from digestate: strip over 90% of the ammonia and make 19% ammonia water from a chicken manure biogas plant. See the design basis.
Ammonia Stripping Pilot Plant Hire: What a 90-Day Trial Involves
Ammonia stripping pilot plant hire: what a 90-day trial on your own wastewater involves, from site evaluation to a firm full-scale design.
Leachate Extraction from Landfill Gas Wells: Sizing an Eductor System
Flooded wells block gas extraction. A worked sizing example for a 24-well eductor system: pump flow, pressure, pipe and discharge capacity.
Dry Cell Anaerobic Digestion for Municipal Organic Waste: How It Works
Dry cell anaerobic digestion for municipal organic waste: how sealed cells, leachate recirculation and upgrading turn 230 t/day into energy.
Expanding a Biological H₂S Scrubber: Questions to Ask Before You Add Tanks
Biological H₂S scrubber underperforming? Questions to ask on pH, temperature and pipework before adding capacity to an existing landfill gas site.
Flare Without a Blower: When a 1,450 m³/h Flare-Only Package Makes Sense
When existing blowers can deliver gas to the flare, a flare-only package avoids paying twice. We look at a 1,450 m³/h enclosed flare for a water reclamation site.
Biogas Flare Delivery to a Wastewater Site: Order to Handover
From handover meeting to completion certificate: how a 1,000 m³/h biogas flare is built, factory-tested, lifted into place and commissioned at a wastewater site.
Choosing a Demister Material for a Knockout Pot
Polypropylene or stainless steel? How to choose a demister material and form for a knockout pot on a leachate plant.
Mechanical Vapour Recompression for Ammonia Concentration
How MVR concentrates ammonium hydroxide from 2% to 20% by reusing vapour heat, with the key duty and reboiler figures.
