Biogas desulphurisation package: a tender checklist built from a 900 Nm³/h bioscrubber and dehumidifier specification.
Phiraphat Eden
Phiraphat is a digital marketer with a passion for turning online attention into real business results. Over the course of his career, he has built expertise across the full marketing stack from SEO, optimizing websites to rank higher and attract organic traffic, to content marketing, crafting blog posts, videos, and guides that engage audiences and build trust. A big part of his approach is data-driven: using analytics tools to track performance, test what works, and refine strategy based on real numbers rather than guesswork. He has set up email marketing and automation workflows that nurture leads and keep customers engaged long after the first click.
Recent Articles
Clinical Waste Pyrolysis for a Hospital: Sizing a 25 Tonne-per-Day Plant
How a pyrolysis and gasification plant was specified to treat 25 tonnes a day of clinical and hazardous waste from a hospital, and why it dumps its heat.
H₂S Bioscrubber for Landfill Biogas: Removing 3,000 ppm Biologically
H2S bioscrubber for biogas: three packed columns cut hydrogen sulphide from 3,000 ppm to under 100 ppm without regular chemicals.
Reviewing a Landfill Gas Flare Specification: Answers to a Contractor’s Queries
Landfill gas flare specification review: how turndown, auxiliary fuel, blower surge and equivalent components were settled with a contractor.
Biomethane Plant Design: From Raw Biogas to 250 Bar Fuel
How raw mill biogas becomes 250 bar compressed biomethane, stage by stage, with the oxygen and moisture limits that drive the design.
Landfill Gas Migration Control: Wells, Pipework and a Flare
How extraction wells with overlapping zones of influence, trenched pipework and a ground flare stop landfill gas moving off site, with no pumping trial.
Covered Lagoon Biogas for a Palm Oil Mill: What a Tender Specification Should Cover
What a covered lagoon biogas tender for a 45 t/h palm oil mill should specify: retention time, liner testing, gas handling, flare, engine and measurable guarantees.
Waste to Energy Pyrolysis: 200 Tonnes a Day to 2.9 MW
What a 200 tonne-a-day pyrolysis and gasification plant can export: about 2.9 MW net, and the moisture, cooling and feed limits that decide it.
Sizing a Covered Lagoon for Palm Oil Mill Effluent
Palm oil mill effluent covered lagoon sizing: from 1,250 t/day of fruit to 813 m³ of POME, a 38,000 m³ lagoon and about 2.4 MW of electricity.
Thermal Ammonia Stripping for Wastewater Centrate: Design and Risks
A thermal ammonia stripper design for wastewater centrate, with guarantees, carbon assessment and risks.
Start your enquiry :
