Sizing a Covered Lagoon for Palm Oil Mill Effluent

by | Dec 17, 2025 | Biogas

Sizing a Covered Lagoon for Palm Oil Mill Effluent

A covered lagoon for palm oil mill effluent (POME) is sized from the mill’s throughput, the effluent volume per tonne of fruit and a design loading of chemical oxygen demand (COD) per cubic metre per day. For a mill processing about 1,250 tonnes of fresh fruit bunches (FFB) a day, a proposal worked this through to a lagoon of roughly 38,000 m³ producing biogas for about 2.4 MW of electricity.

The challenge: turning mill throughput into a reactor size

The mill was rated at about 63 tonnes of FFB an hour and ran roughly 20 hours a day. The owner wanted biogas for engines and possibly for compressed biomethane. The design question was how big the lagoon and gas train needed to be.

The calculation, step by step

  1. Effluent volume. POME was taken as 0.65 m³ per tonne of FFB. That gives roughly 813 m³/day, with a peak of about 41 m³/h.
  2. Strength. The mill’s COD was about 70,000 g/m³ (70 kg/m³), which is why POME is such a strong waste. The design removed 80% of it.
  3. Loading. The lagoon was designed at about 1.3 kg COD per m³ per day, a low rate that gives long retention and stability.
  4. Volume. That loading required a wetted volume of about 35,400 m³, within a lagoon of roughly 37,700 m³ including freeboard and about 7,900 m² of area.
  5. Biogas. About 29,000 Nm³/day at 55% methane, or roughly 1,200 Nm³ per operating hour.
  6. Power. About 6 MW of thermal energy in the methane, which at 37% engine efficiency is about 2.4 MW of electricity in a month of full production.

Features that make it work

  • Cooling first. POME arrives hot, so a screen filter and induced-draught cooling tower bring it to about 40°C before it reaches the reactor.
  • Bottom feeding. Influent enters through pipes along the floor of the lagoon, pushing upward through the sludge. This almost eliminates settlement and keeps digestion going even when no effluent is delivered for a few days.
  • Combined structure. Fresh POME mixes with recirculated lagoon liquid in a buffer tank before entering, which damps shocks.
  • Carbonic acid pH control. This avoids chemical dosing.
  • Walk-on cover. Operators can inspect it and take samples from ports, and it is designed to resist wind.
  • Seeding. The owner supplies seed sludge of at least 60% of the wetted volume.

The gas train

Two bioscrubber tanks (each about 13 m by 3.5 m) reduce H₂S from about 3,000 ppm to a few hundred ppm or below. A chiller dehumidifies the gas, and duty and standby blowers deliver it at about 300 mbar. A standby open-flame flare is sized to 1,250 Nm³/h with a 5:1 turndown. A buried HDPE pipeline carries gas to the powerhouse. The turnkey scope excluded the engines but included a powerhouse building ready for two.

Why a lagoon, and its limits

A covered lagoon needs more land than a tank or UASB but tolerates upsets and needs only a trained mill technician to run it. The proposal estimated about 12 months from order to commissioning. It also reinforces the covered-lagoon logic in our earlier posts on cassava wastewater and H₂S bio-scrubbers.

What to consider for your own project

  1. Use measured POME flow and COD. Per-tonne factors are only a starting estimate.
  2. Check available land. Lagoon footprint is the main limit.
  3. Plan the cooling. Hot POME slows or upsets digestion.
  4. Decide the gas use. Engines, boiler or upgraded biomethane change the gas train.
  5. Allow for seeding. A large volume of seed sludge is needed.

For guidance on palm oil sustainability and methane capture in the sector, see the UK Government’s palm oil guidance.

FAQ

How much POME does a palm oil mill produce?

Here 0.65 m³ per tonne of FFB, or about 813 m³/day for 1,250 tonnes.

How much electricity can POME produce?

About 2.4 MW from this mill at full throughput.

Why is the loading rate so low?

A low loading gives long retention and stability, so stubborn COD is digested.

Planning POME biogas?

Send us your throughput and effluent data and we will estimate lagoon size and output.

Start your enquiry :


Translate »
organics.co.uk
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.