How a skid-mounted low-methane flare keeps weak gas burning, and what to tell the supplier before you order.
Phiraphat Eden
Phiraphat is a digital marketer with a passion for turning online attention into real business results. Over the course of his career, he has built expertise across the full marketing stack from SEO, optimizing websites to rank higher and attract organic traffic, to content marketing, crafting blog posts, videos, and guides that engage audiences and build trust. A big part of his approach is data-driven: using analytics tools to track performance, test what works, and refine strategy based on real numbers rather than guesswork. He has set up email marketing and automation workflows that nurture leads and keep customers engaged long after the first click.
Recent Articles
Automatic Gas Monitoring for Buildings on Reclaimed Land
How an automatic gas monitoring system protects buildings on reclaimed land: four gases, sampling tubes, alarms to security, and a trained management response.
Flare Modulating Valve Failure: A Fault-Finding Case Study
Flare modulating valve failure traced to a faulty emergency stop and manual operation while energised. See the diagnosis and the repair.
Landfill Leachate Ammonia Stripper Powered by Landfill Gas
Using on-site landfill gas to strip and destroy ammonia from leachate.
SBR Leachate Treatment: Cutting Ammonia and COD at a Landfill
SBR leachate treatment explained: a temporary plant to cut ammonia and COD, with realistic installation and commissioning timescales.
How a Landfill Gas Pumping Trial Works: Method and Worked Example
Landfill gas pumping trial: how the tests, wells and equipment prove gas yield, using a four-week, eight-well worked example.
Mobile Landfill Gas Flare: How a Hinged-Chimney Unit Works
Mobile landfill gas flare explained: a skid-mounted 500 m³/h ground flare with a hydraulic-jack chimney, and when hiring before buying suits your site.
Replacing Discontinued Leachate Pumps: Confirm the Duty First
How to replace discontinued leachate pumps by confirming flow, head and liquid before ordering the equivalent model.
Ammonia Stripping for High-Strength Centrate: Choosing the Process
How a thermally driven ammonia stripper was selected for 450 m³/day of centrate at 21,400 mg/l ammonium, and what the alternatives would have cost in space, chemicals and complexity.
Solar PV Park Site Requirements: Planning a 30 MW Plant
What makes a good site for a utility-scale solar PV park: land, soil, grid access and a staged route from fatal flaw analysis to 30 MW.
Start your enquiry :
