An anaerobic membrane bioreactor (AnMBR) digests palm oil mill effluent in a compact steel tank, keeping the biomass inside with filtration. For a 60 tonne-per-hour mill in Sabah, the design treated 600 m³ a day at 55,000 mg/l COD with 85% removal, giving up to 1.5 MW of electricity. This article explains why it was chosen and what the numbers mean.

The challenge: no history, tight space and a wet climate

The mill had no reliable record of effluent flow or COD, so the design used values from the tender document. The mill already ran steam turbines for about 1 MW and diesel engines for roughly 300 kW. The aim was to replace the diesel generation with biogas. After a client meeting, the supply was widened to engines covering the full 1.5 MW potential.

The design basis

ParameterValueWhat it means
Effluent0.5 m³ per tonne of fruit bunches; 600 m³/day; peak 36 m³/hMill runs 20 hours a day
COD in55,000 mg/l, 33,000 kg/dayThe organic load
COD removal85%Most is converted to gas
Tank volumeAbout 6,600 m³Small compared with a lagoon
BiogasAbout 17,900 Nm³/day50 to 60% methane
Electrical outputUp to 1.5 MW at 37% engine efficiencyGross

Holding 33,000 kg of COD a day in a 6,600 m³ tank corresponds to a loading of around 5 kg per m³ per day (our calculation), far higher than a lagoon design, which is why the footprint is much smaller.

Why an AnMBR

  1. Footprint. A high COD allows a smaller reactor.
  2. Weather. Civil work is limited to foundations, so construction is less affected by the rainy season, which stops lagoon building.
  3. Biomass control. It borrows UASB know-how for mixing and biomass management without the UASB weakness with suspended solids.

Materials

The tank is epoxy-lined steel. Digesters are oxygen-free, so general corrosion is low, but POME contains salts that can cause pitting. Bare carbon steel was ruled out to avoid a premature failure.

The gas train

  • Bioscrubber taking H₂S from about 2,500 ppm to under 200 ppm.
  • Dewatering unit to a 25°C dew point.
  • Two boosters in duty-standby, 200 mbar head.
  • Standby flare for 750 Nm³/h and 150 to 750 Nm³/h gas range.
  • Gas engines, supplied by a local company so service is nearby.

Delivery and exclusions

The scheme was offered as a turnkey package with a local civils partner and 10 to 12 months to commissioning. Import duty was excluded: as a renewable energy project, the owner was expected to seek tax exemption, with technical help from the supplier.

What to consider for your own project

  1. Get data. Without effluent records, assumptions carry risk. Sample before detailed design.
  2. Size engines to the gas. Do not size to the mill’s diesel load only.
  3. Check materials against salts. Coatings matter.
  4. Plan the sludge. The proposal assumed a disposal pond within 200 m.

For policy background see the UK Anaerobic Digestion Strategy and Action Plan.

FAQ

What is an AnMBR?

A digester that keeps biomass in by membrane filtration, allowing high loading in a small tank.

Why not a UASB?

POME’s suspended solids damage UASB granules.

How long to deliver?

About 10 to 12 months.

Generating from POME?

Talk to us about digester options for your mill.

Start your enquiry :


Translate »
organics.co.uk

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.