Mobile LPG Flare for Pipeline Depressurisation

by | Apr 6, 2026 | Mobile flares

Mobile LPG Flare for Pipeline Depressurisation

A mobile LPG flare for pipeline depressurisation is a hinged, truck-mounted flare stack that three trained technicians can erect in under an hour and burn off a pipeline section safely, without any site utilities. This post uses a tender for two such units, serving an LPG pipeline in India, to show what the design must include and which specification points were negotiated.

The challenge: flaring where there are no utilities

Before a section of LPG pipeline can be worked on, its contents must be released and burned off. The operator wanted two mobile flare systems that could travel along the route. The tender data sheet gave:

  • Gas: LPG, about half propane and half butane.
  • Design flare load: 10,000 kg/h.
  • Stack: 6 inch diameter and 20 m high, including seal and tip.
  • Maximum pressure drop in the tip and seal of 500 mm water column.
  • Noise below 90 dB(A) at 1 m from the stack base.
  • No utilities available on site. The vendor had to provide pilot gas, purge gas and power.

The approach: a hinged flare on a truck

The offer was an AC Range mobile flare, rated at about 4,300 normal m³/h. Its main features were:

  • Hinge-mounted riser and tip. The sections arrive folded on a truck flatbed. The operator moves the hinges to form the full length, then lifts the stack with a manual pulley. Supporting guy ropes take the load when it is lowered again.
  • A 310 stainless steel tip, and 310 stainless for the top four metres of the riser, to resist heat damage. The tip is designed for winds of at least 180 km/h.
  • Multi-nozzle burner with air and gas mixing at the tip to limit smoke.
  • Two pilot burners in the windshield, designed to stay lit in high wind, ignited by a flame front generator in an explosion-protected enclosure.
  • A fluidic seal to reduce the purge gas needed, with gas cylinders supplying purge and pilot needs.
  • Safety items. Pressure switches for over- and under-pressure, a flame arrester on the feed and pilot lines, a manual trim valve and an orifice plate flow meter.

Points settled in the bid stage

A meeting with the consultant produced several clarifications that make a useful checklist.

  • Seal type. Because the flare is dismantled after each use, the supplier offered two interchangeable sections: one with a molecular seal and one with a fluidic seal. Operators choose what suits the situation. The molecular seal includes a water seal with level measurement.
  • Vaporiser. With LPG at roughly 50:50 propane and butane, the supplier did not expect liquid to form in the flare line, so no vaporiser was needed.
  • Pressure control valve. The tender asked for one, but the supplier judged it unnecessary and offered a price reduction for omitting it.
  • Water seal drum. Recommended as a low-cost safety item, though not strictly required.
  • Purge gas. Four nitrogen cylinders per set, bought locally.
  • Drawings. General arrangement drawings were not supplied at the tender stage because they contain proprietary information. They would be supplied for approval before construction.

Because the stack is 20 m long, it travels in segments, with a tractor and trailer to carry and erect it. The vehicle is required to meet local road standards.

Why the design suits the job

Everything reduces setup time and dependence on the site. Hinges and a manual pulley replace a crane. Cylinders replace utilities. Quick-release couplers connect the electrical equipment on the shroud. The trade-off is that cylinders run out, so the numbers of pilot and purge cylinders must match the planned duration of each flaring job.

What to consider for your own project

  1. Define the gas. Composition decides whether you need a vaporiser and how smokeless the burner must be.
  2. Set the erection time. A target such as under an hour with three technicians is measurable.
  3. Count your cylinders. Pilot, ignition and purge all draw on them.
  4. Question inherited requirements. A pressure control valve that serves no purpose adds cost and a failure point.
  5. Check noise and wind limits against the site and the stack height.

For flaring rules in the UK, the Environment Agency’s landfill gas guidance (LFTGN03) applies to landfill sites. Pipeline flaring is regulated differently, so consult your regulator. See also our post on the mobile landfill gas flare.

FAQ

What is a mobile flare used for?

Burning gas safely at temporary locations, for example when a pipeline section is depressurised before maintenance.

How quickly can a mobile flare be erected?

In this design, three trained technicians were expected to erect it in under an hour.

Why use a fluidic seal?

It reduces the purge gas needed to keep air out of the stack.

Does LPG need a vaporiser?

Not if no liquid is expected to form in the flare line, as with this propane and butane mix.

Need a mobile flare?

Tell us about your gas and duty and we will outline a mobile flare.

Start your enquiry :


Translate »
organics.co.uk
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.